Arnison Centre, Durham

The Park Lighting Design team were appointed by Hepple Engineering when The Arnison Centre undertook a multi-million-pound expansion. Lighting was required within the parking area as the existing system had come to the end of its life.

Solution:

The overall objective was to provide a very welcoming ambiance for customers and the lighting system was central to that with the project spanning over 14,000 sq ft. Working alongside supplier Thorn Lighting, the new CiviTEQ LED road lighting solution was chosen.

With a five-year guarantee, the CiviTEQ features a compact and lightweight luminaire for easy handling and installation. Highly cost effective, wattage is constantly set at a very low 39W and night-time dimming also plays a big role in significantly saving energy. Road and street optics were also commissioned so there is no upward lighting.

Client Feedback:

“We appointed Park to work alongside us as it is a highly valued and trusted partner” said Steve Limerick, Hepple Engineering. “The company is very strong at providing practical solutions to often quite technical issues, which was certainly the case on this project. It is very professional and always delivers on time.”